Skip to content

Reports

Reports (a project tab) — a dashboard for the chosen period:

  • the pass rate of runs over time, manual runs and automated tests from CI separately (hover for the run’s data; a table under the chart);
  • failures by top-level suite, time of manual runs, automation coverage (overall and by suite);
  • open bugs linked to results, and flaky tests.

Run report (the “Report” link on a run page) — to send around: a summary, failures with the step where it failed, the comment and bugs, a comparison with the previous run of the same cases (new failures, fixed, still failing), failures by suite. “Save as PDF” opens printing with a layout for paper. An administrator can create a link that opens the report without signing in (without attachments), and revoke it; both show in the audit log.